Aztec Intersects 0.60 gpt AuEq Over 114.3m, Continuing the Expansion of the Shallow Footprint of the Broad, Oxide Gold-Silver Contention Zone, in 2024 Drill Program at the Tombstone Property, Arizona USA

In This Article:

VANCOUVER, BRITISH COLUMBIA - (NewMediaWire) - December 23, 2024 - Aztec Minerals Corp. (AZT: TSX-V, OTCQB: AZZTF) ("Aztec" or the "Company") announces that the ongoing 2024 drilling program at the Tombstone Property in Southeastern Arizona has further intersected broad gold-silver oxide mineralized zones in its subsequent step out RC drill holes in the Contention Open Pit target area. Results for hole TR24-05 intersected 114.3 m at 0.60 gpt AuEq (0.39 gpt Au and 16.61 gpt Ag); including 10.7 m at 1.99 gpt AuEq (1.55 gpt Au and 34.6 gpt Ag). Hole TR24-03 intersected 0.23 gpt Au and 10.43 gpt Ag (0.36 gpt AuEq) over 35.1m and 0.33 gpt Au and 9.8 gpt Ag (0.45 gpt AuEq) over 88.4m, and hole TR24-04 intersected 0.24 gpt Au and 15.58 gpt Ag (0.38 gpt AuEq) over 123.5m including 6.1m of 1.74 gpt Au and 54.75 gpt Ag (2.42 gpt AuEq).

The Contention area step-out drill holes have targeted shallow zones, associated with recently completed surface exploration and 3D geological modelling, prospective for wide oxide gold-silver mineralization. The 2024 RC drilling program has now completed 15 RC drill holes of Contention area step out targets and Westside Area first pass targets (see Figure 1. below), with results from the first 5 holes now announced. Visual observations of the drilled sample materials and initial assay results continue to validate Aztec's geological exploration model.

- DH TR24-05 intersected 0.60 gpt AuEq over 114.3 m (0.39 gpt Au & 16.61 gpt Ag); including 1.99 gpt AuEq over 10.7m (1.55 gpt Au & 34.6 gpt Ag)

- 15 RC holes have now been drilled with additional results pending release over the next several weeks

- The 2024 drill program continues to test step out and first pass targets primarily west of the historic Contention Open pit target zone

Initial Drilling Highlights:

- Hole TR24-03 - 0.23 gpt Au and 10.43 gpt Ag (0.36 gpt AuEq) over 35.1m, and 0.33 gpt Au and 9.8 gpt Ag (0.45 gpt AuEq) over 88.4m including 9.1m grading 1.67 gpt Au and 20.43 gpt Ag (1.92 gpt AuEq). The hole was oriented azimuth 105, -60, and was designed to test for westerly and down dip extensions of mineralization under the Contention pit west wall and to depth. Two mine tunnels were intercepted. The interval is composed of siliciously and argillically altered, lower Bisbee group fine-grained sandstones/quartzites, siltstones/hornfels cut by quartz-feldspar porphyry dikes, hydrothermal breccias and faults/fissures with quartz veining. Moderate to strong iron oxides, manganese oxides, orange to red color, and 1 to 10% oxidized pyrite sites. The drill hole had to be abandoned due to caving.