Atlantic Lithium Limited Announces Highest Reported Grade to Date of 4.52% Li2O

In This Article:

Highest Reported Grade to Date of 4.52% Li2O over 1m Multiple High-Grade and Broad Drill Intersections Ewoyaa Lithium Project Ghana, West Africa

SYDNEY, AUSTRALIA / ACCESSWIRE / November 2, 2022 / Atlantic Lithium Limited (AIM:ALL)(OTCQX:ALLIF)(ASX:A11) "Atlantic Lithium" or the "Company"), the funded African-focussed lithium exploration and development company targeting to deliver Ghana's first lithium mine, is pleased to announce assay results from the resource and exploration drilling programme now completed at the Ewoyaa Lithium Project ("Ewoyaa" or the "Project") in Ghana, West Africa.

Figures, Tables and Appendices referred to in this release can be viewed in the PDF version available via this link:

http://www.rns-pdf.londonstockexchange.com/rns/9992E_1-2022-11-1.pdf

HIGHLIGHTS:

Ø Assay results reported for 5,668m of infill and exploration reverse circulation ("RC") drilling completed at the Ewoyaa Main, Grasscutter East, Grasscutter West and Anokyi deposits, part of the now-completed resource evaluation and exploration RC and diamond drilling ("DD") programme.

Ø Newly reported drilling results fall both within and outside the currently defined 30.1Mt @ 1.26% Li2O Ewoyaa JORC (2012) Compliant Mineral Resource Estimate ("MRE" or the "Resource"), providing further confidence in Resource conversion at the Ewoyaa Main deposit, and extending mineralisation downdip at the Grasscutter East, Grasscutter West and Anokyi deposits.

  • Highest reported single RC assay result to date of 4.52% Li2O over 1m in hole GRC0704 from 54m and 3.99% Li2O from 53m.

  • Broad, high-grade infill drill intersections within the current MRE reported at the Ewoyaa Main deposit including highlights of:

    • GRC0697: 95m at 1.48% Li2O from 5m

    • GRC0703: 87m at 1.61% Li2O from 0m

    • GRC0701: 78m at 1.67% Li2O from 12m

    • GRC0710: 74m at 1.65% Li2O from 15m

    • GRC0692: 76m at 1.43% Li2O from 14m

    • GRC0720: 62m at 1.34% Li2O from 28m

    • GRC0722: 57m at 1.31% Li2O from 23m

    • GRC0717: 47m at 1.57% Li2O from 43m

    • GRC0696: 44m at 1.41% Li2O from 7m

    • GRC0712: 72m at 0.85% Li2O from 18m

    • GRC0700: 44m at 1.32% Li2O from 46m

    • GRC0725: 43m at 1.13% Li2O from 44m

    • GRC0706: 27m at 1.57% Li2O from 38m

    • GRC0704: 23m at 1.4% Li2O from 36m

    • GRC0711: 23m at 1.38% Li2O from 39m

    • GRC0696: 30m at 0.94% Li2O from 58m

    • GRC0704: 16m at 1.65% Li2O from 73m

    • GRC0724: 21m at 1.18% Li2O from 30m

    • GRC0694: 20m at 1.05% Li2O from 24m

  • Broad, high-grade exploration drill intersections outside of the current MRE, reported at the Grasscutter East, Grasscutter West and Anokyi deposits, including highlights of:

    • GRC0721: 45m at 1.16% Li2O from 274m

    • GRC0695: 29m at 1.72% Li2O from 141m

    • GRC0705: 25m at 1.49% Li2O from 171m

    • GRC0693: 23m at 1.18% Li2O from 274m

    • GRC0699: 14m at 1.66% Li2O from 213m

    • GRC0716: 13m at 1.36% Li2O from 302m

    • GRC0721: 11m at 1.44% Li2O from 177m

    • GRC0718A: 14m at 0.93% Li2O from 193m

    • GRC0713: 10m at 1.2% Li2O from 172m

    • GRC0709: 10m at 1.02% Li2O from 176m

  • Approximately 21,000m of results from the 47,000m drilling programme reported to date.

  • Recently announced Pre-Feasibility Study (refer RNS of 22 September 2022) delivers exceptional financial outcomes for a 2Mtpa operation, producing an average c. 255,000tpa of 6% Li2O spodumene concentrate ("SC6") over a 12.5-year operation:

    • LOM revenues exceeding US$4.84bn, Post-tax NPV8 of US$1.33bn, IRR of 224% over 12.5 years

    • US$125m capital cost estimate with an industry-leading payback period of <5 months

    • C1 cash operating costs of US$278 per tonne of 6% lithium spodumene concentrate Free on Board ("FOB") Ghana Port, after by-product credits

    • Average Life of Mine ("LOM") EBITDA of US$248m per annum

    • 18.9Mt at 1.24% Li2O Maiden Ore Reserve

    • Average annualised US$1,359/dry metric tonne SC6 pricing used

  • Significant potential for resource upgrades and exploration upside; potential for project metrics to substantially improve with increased scale.