Aston Bay Presents Corporate Update

In This Article:

Aston Bay Holdings Ltd. (TSXV:BAY)(OTCQB:ATBHF) ("Aston Bay" or the "Company") is pleased to provide an update on its Epworth Project ("Epworth") and the 2024 drilling and regional exploration activities at the Storm Copper Project ("Storm") in Nunavut.

Thomas Ullrich, Chief Executive Officer of Aston Bay,commented:

"It has been a successful year of exploration at both our Storm and Epworth Projects in Nunavut.

"At Storm, 22,475m of drilling was completed, exceeding expectations. Assay results demonstrated consistent copper grades, highlighting the excellent lateral continuity of the high-grade mineralization within the known zones and defining new discoveries and prospective areas. Work is well advanced on the maiden resource for Storm and the development study work. Reports on both fronts are expected in early 2025.

"At Epworth, we are impressed with the preliminary look at the property-wide MobileMT geophysical survey results and rock and lake sediment survey results. We are processing the geophysical results further and look forward to presenting a comprehensive compilation with the mapping and sampling results in January."

Epworth Project

A prospecting, rock sampling, and geological mapping program was conducted in 2024, including structural and stratigraphic studies by Dr. Elizabeth Turner. Nine claims totalling an additional 11,900 hectares ("ha") (119 square kilometres ("km2")) were added to the claims package, now totalling 89,000 ha (890 km2)

An 8,105 line-km airborne MobileMT survey covering the claim block commenced in late August and was completed in late September. Compilation of the assay results and additional geophysical data processing are underway. When all results are received, they will be integrated with historic work and released with a new interpretation in the New Year.

Storm Project

A total of 22,475m of drilling was conducted in 153 drill holes (19,879m in 138 Reverse Circulation ("RC") holes and 2,596m in 15 diamond drill holes) during the 2024 season. Assay results demonstrated consistent copper grades, highlighting the excellent lateral continuity of the high-grade mineralization within the known zones and defining new discoveries and prospective areas. Work is well advanced on a maiden resource constructed to Canadian Institute of Mining standards for a January 2025 release.

In addition to the drill hole results previously released, several scout holes were drilled to assist in interpreting the geologic framework in the Storm area. Results from these drill holes, the final results of the 2024 program, are presented below.