American Pacific Drills 10.4 Metres of 1.17% Copper, 12.17% Zinc, 1.01 g/t Gold and 101.49 g/t Silver (7.3% Copper Equivalent) from Zone 1 at the Palmer Copper-Zinc VMS Project

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - October 31, 2024) - American Pacific Mining Corp. (CSE: USGD) (OTCQX: USGDF)  (FSE: 1QC) ("American Pacific" or "the Company") is pleased to report assay results from the first seven (7) holes of the Company's sixteen (16) hole drill program at its Palmer Copper-Zinc VMS Project ("Palmer") in Southeast Alaska. The 2024 drill program was part of a planned CAD $17.5 million (USD $12.8 million) exploration and development budget funded by a joint venture partnership between Dowa Metals & Mining Alaska Ltd. ("Dowa") and American Pacific (see March 25, 2024 news release). The initial assay results provided herein are from South Wall Zone 1 and RW Zone (2 holes) of the Palmer Deposit.

Highlights include:

  • CMR24-194: 16.4 m of 0.8% Cu, 8.4% Zn, 0.6% Pb, 0.72 g/t Au and 77.5 g/t Ag (5.1 CuEq);
    including 10.4 m of 1.17% Cu, 12.17% Zn, 1.01 g/t Au and 101.49 g/t Ag (7.3% CuEq)

  • CMR24-193: 3.5 m of 0.1% Cu, 1.7% Zn, 0.6% Pb, 0.86 g/t Au and 92.4 g/t Ag (1.9% CuEq)

  • CMR24-192: 2.9 m of 3.5% Cu, 0.68% Zn, 0.3 g/t Ag (3.8% CuEq) and 9.8 m of 0.58% Cu further downhole

Notes: m = metres; Cu=copper; Zn=zinc; Au=gold; Ag=silver; Pb=lead. CuEq=copper equivalent. Copper Equivalent calculated using the same metal prices and recovery assumptions as the Company's NI 43-101 Technical Report (JDS 2022). See Table 1 for all new assay results and corresponding disclosure notes.

"This year's drill program was successful in following up on last year's high-grade results, while better defining the known mineralization on the property, ahead of the updated Mineral Resource Estimate and Technical Report budgeted to begin this year," commented Peter Mercer, VP Advanced Projects for American Pacific. "The Palmer Project is located within a prolific mineral belt in Southeast Alaska. This mineral terrane extends hundreds of kilometres north and south of Palmer, hosting several historic and current mining operations. The Palmer and AG deposits are just two of the mineralized areas defined and drill tested to date, on the property that has district-scale potential."

The 2024 drill program included a total of 6,035.9 metres (19,650 feet) in nineteen (19) drill holes including three (3) drill holes (125.8 metres; 410 feet) that were recollared. The drill program was designed to continue infill drilling and testing the extents of the high-grade copper-zinc mineralization of the South Wall Zone 1 and Zone 2-3. The program also included three exploration drill holes for 1,033.3 metres (3,390 feet) to test the nearby North Wall Target testing, a potential fault offset extension of the South Wall mineralization.