American Future Fuel Announces Outstanding Results from its 26-Hole, Phase 1 Drilling Program at Cebolleta
American Future Fuel Corporation
American Future Fuel Corporation

Figure 1

Historical Drilling and Confirmation Drilling Locations
Historical Drilling and Confirmation Drilling Locations

VANCOUVER, British Columbia, Nov. 22, 2023 (GLOBE NEWSWIRE) -- American Future Fuel Corporation (CSE: AMPS; OTCQB: AFFCF; FWB: K14, WKN: A3DQFB) (the “Company” or “American Future Fuel”), is pleased to announce the completion of its Phase 1 drilling program at the Company’s flagship Cebolleta Uranium Project (“Cebolleta” or the “Project”) located in the Grants Uranium Mineral Belt. The purpose of the Phase 1 drill program has been to validate historical drill results to prepare a mineral resource estimate.

The Phase I drill program consisted of 26 drill holes averaging 336 feet (112 meters) deep for a total of 9,530 feet (2,904 meters). Radiometric equivalent U308 grade (% e U3O8) values closely match historical data from nearby holes completed by Sohio Western Mining Company (Sohio) from over 50 years ago. Table 1 and Table 2 presented below provide highlights from the Phase 1 drill program and a direct comparison of the historical drilling. The outstanding results presented are a testament to the quality of the Cebolleta deposit and Sohio’s previous work that is the foundation of the 18.98M lbs U3O8 historical resource that the Company is confident will be brought current as part of the next two phases of drilling. The reliability of the historical estimate is considered reasonable, but a qualified person has not done sufficient work to classify the historical estimate as a current Mineral Resource and the Company is not treating the historical estimate as a current Mineral Resource. The purpose of the confirmation drilling is to accomplish this task.

David Suda, CEO of the Company, stated, “The outstanding drill results from Phase 1 speak for themselves. American Future Fuel has taken a significant step toward delivering an updated resource in a very time and cost-efficient manner. We believe that the Cebolleta project represents a Tier 1 deposit within the United States. The Company is seizing on a rare opportunity to create significant shareholder value while limiting risk. We are also excited by the potential for meaningful growth at the St. Anthony portion of the project where there is a major opportunity to expand the resources inside of our property boundaries.”

Table 1. Cebolleta Phase 1 Drilling Program Highlights (GT>1)

Twin Hole

Top Depth

Thick

Grade

GT

ft

m

ft

m

(% eU3O8)

(grade x thick)

RLB-83 Twin

231.0

70.4

18.8

5.7

0.16

3.0

LJ-5 Twin

242.5

73.9

9.8

3.0

0.36

3.5

LJ-25 Twin

234.1

71.5

14.4

4.3

0.20

2.9

RLB-20 Twin B

339.4

103.5

6.7

2.0

0.27

1.8

RLB-23 Twin

338.9

103.3

13.6

4.1

0.26

3.5

RLB-18 Twin A

334.9

102.1

10.6

3.2

0.16

1.7

RLB-18 Twin B

339.2

103.4

9.6

2.9

0.15

1.4

A-3 Twin B

331.6

101.1

22.8

6.9

0.17

3.9

A-12 Twin

315.3

96.1

10.4

3.2

0.22

2.3

A-8 Twin A

325.2

99.1

12.3

3.7

0.16

1.9

343.3

104.6

3.2

1.0

0.50

1.6

A-8 Twin B

325.4

99.2

13.9

4.2

0.11

1.5

LJ-126 Twin

361.0

110.0

2.8

0.9

0.47

1.3

LJ-121 Twin

305.3

93.1

9.7

3.0

0.11

1.0


Historical Drilling and Confirmation Drilling Locations
Historical Drilling and Confirmation Drilling Locations


Figure 1 – Historical Drilling and Confirmation Drilling Locations