Alpha Exploration Announces Final Assay Results Including 5m @ 11.03 g/t Gold at Aburna

In This Article:

Calgary, Alberta--(Newsfile Corp. - April 26, 2024) - Alpha Exploration Ltd. (TSXV: ALEX) ("Alpha" or the "Company") announces final results from the first phase of its 2024 drilling program on its Aburna Gold Prospect ("Aburna") on the Company's 100% owned, 771 km² Kerkasha Project located in Eritrea. Drilling consists of both reverse-circulation ("RC") drilling and diamond core ("DC") drilling.

Final assays have now been received for the remaining 16 drillholes drilled at Aburna in Q1 2024 and including 5 holes from Hill 52, 5 drillholes from Central Area with a further 6 drillholes at Northeast Area. All drillholes except for DD holes ABD014, ABD015 and ABD016 were drilled as diamond tail extensions to existing RC drillholes completed earlier in March this year, and were designed to test mineralization down plunge of the current mineralized lenses at all three prospects. Additional drilling results reported in this first phase program area available here: https://alpha-exploration.com/wp-content/uploads/2024/03/News-Release-Alpha_Drilling-Results-01-March-2024.pdf, and https://alpha-exploration.com/alpha-exploration-annouces-more-positive-drilling-results-from-aburna/.

HIGHLIGHTS:

  • Drillhole ABRD113: 5m @ 11.03 g/t Au (Northeast Area)

  • Drillhole ABRD118: 4m @ 5.94 g/t Au (Central Area)

  • Drillhole ABRD105: 22m @ 1.71 g/t Au (Central Area)

  • Drillhole ABRD104: 18m @ 1.17 g/t Au (Central Area)

  • First phase 6,247m drilling program now complete

Alpha has now completed the first phase of a planned 20,000m, 2024 drilling program at Aburna. Drillhole ABRD113 was designed to test the main Northeast Area mineralized shoot at depth and successfully intercepted the high-grade lens including 5m @ 11.03 g/t Au. The width and grade of the intercept are consistent with the rest of the Northeast Area footwall shoot that includes prior drillholes ABR037 16m @ 14.07 g/t Au and ABR078 (9m @ 5.99 g/t Au). Drillhole ABRD118 was designed to test down dip potential at Central Area and successfully intercepted 4m @ 5.96 g/t Au, extending known mineralization down dip.

Aburna is a major, district scale orogenic gold prospect covering an area of at least 7km long and 2km wide and is one of the three significant discoveries made by Alpha on the Kerkasha licence in the last three years. Exploration to date by Alpha on the project has defined six primary areas of interest at Aburna, and has established significant high-grade gold mineralized systems at Central Area, Hill 52 and Northeast Area (see Figure 1, below).