ADDITIONAL RESULTS FROM THE LAPON CANYON AND PIKES PEAK PROJECTS NEVADA CANYON OWNED ROYALTIES

In This Article:

Nevada Canyon Gold Corp.
Nevada Canyon Gold Corp.

Reno, Nevada, Oct. 15, 2024 (GLOBE NEWSWIRE) -- Nevada Canyon Gold Corp. (OTC Markets: NGLD) (The “Company” or “Nevada Canyon”) is pleased to announce it has been informed that additional drill results have been released from the 2024 reverse circulation (“RC”) drill program on the Lapon Canyon Project, (the “Project”) a Nevada Canyon owned royalty, located in Mineral County, Nevada.

Nevada Canyon owns a 3% Net Smelter Royalty (“NSR”) on the Project, (see news release 05-28-2024) Walker River Resources Corp. (“Walker River”) owns a 100% undivided interest in the Project consisting of 96 unpatented lode situated in Mineral County, Nevada, within the northern portion of the Walker Lane gold trend.

Walker River Resources Corp (TSX.V: WRR), announced on October 15, 2024 (see WRR news release 10-15-2024) additional drill results from the 2024 RC drill program at the Lapon Canyon Project, along with assays results from underground channel sampling completed at a recently re-opened adit on the Pikes Peak Project (a Nevada Canyon owned royalty, see news release 06-13-2024), located in Mineral County, Nevada, 60 km SE of Yerington, NV.

Key Highlights

  • Drill assay results from holes LC-24-101 to -105 continue to demonstrate a robust gold mineralized zone at Hotspot, extending the zone from its initial discovery approximately 125 metres laterally east and to a depth of more than 100 metres.

  • LC-24-102 returned 3.4 g/t Au over 56.4 meters including 6.1 g/t Au over 27.4 meters and 12.4 g/t Au over 6.1 metres. The hole ended in mineralization at 121.9 metres.

  • LC-24-103 returned 0.6 g/t Au over 88.4 metres, ending in mineralization at 121.9 metres.

  • LC-24-105 returned 1.2 g/t Au over 86.9 meters, including 3.3 g/t Au over 9.1 metres and 3.2 g/t Au over 6.1 metres

  • Drill results continue to define a broad, potentially flat-lying geometry of the gold system, now extending more than 400 m east-west and 600 m north-south, covering an area ~0.27 square kilometres. Localized high-grade shoots are emerging within the broader mineralized domains and continue to be tested by drilling.

  • At the Pikes Peak Project, underground channel sampling from a recently re-opened adit (tunnel) returned highlighted assay results of 36.4 g/t Au, 10.7 g/t Au, and 19.8 g/t Au

Table 1: Selected results from new drill assays from the Hotspot Zone.

Drill Hole

 

From

To

Width*

Gold

Gram metres

 

(m)

(m)

(m)

(g/t)

(g/t*m)

LC-24-101

 

3.1

97.5

94.5

0.4

35.9

 

including

41.2

56.4

15.2

0.8

12.3

LC-24-102

 

3.1

45.7

42.7

0.2

7.7

 

and

65.5

121.9

56.4

3.4

190.6

 

including

67.1

94.5

27.4

6.1

167.0

 

and including

88.4

94.5

6.1

12.4

75.5

LC-24-103

 

33.5

121.9

88.4

0.6

54.8

LC-24-104

 

22.9

86.9

64.0

0.5

30.1

LC-24-105

 

4.6

91.4

86.9

1.2

105.1

 

including

53.3

62.5

9.1

3.3

30.3

 

and including

70.1

76.2

6.1

3.2

19.7

LC-24-106

 

0.0

68.6

68.6

0.3

17.8

* The above drill results are presented with lengths representing sampled lengths. True width is estimated to be between 65 and 90 percent of sampled widths.