AbraSilver Announces Initial Drill Results from Phase IV Exploration Program at the Diablillos Silver-Gold Project; Intersects 33 Metres Grading 245 g/t Silver
NewMediaWire · The Newswire

In This Article:

TORONTO - (NewMediaWire) - July 22, 2024 - AbraSilver Resource Corp. (TSX.V: ABRA; OTCQX: ABBRF) ("AbraSilver" or the "Company") is pleased to announce the first set of assay results from the Company's fully-funded 20,000 metre Phase IV drill program, on its wholly-owned Diablillos project in Salta Province, Argentina (the "Project").

The ongoing Phase IV drill program is focused on expanding target areas with known mineralization as well as exploring newly identified prospective exploration targets within the broader Diablillos land package. Key takeaways from the latest drill results include the following holes all in the southwest of the JAC zone:

- Hole DDH 24-003 intersected a broad zone of near-surface silver mineralization, consisting of 33 metres grading 87 g/t Ag starting at a down-hole depth of only 69 metres. The intercept is located in a zone within the conceptual open pit boundary that is currently classified as waste.

- Hole DDH 24-004 encountered a wide zone of high-grade silver mineralization, grading 245 g/t Ag over 33.4 metres. Drilling in this zone is designed to convert Inferred Mineral Resources to the Indicated category, within the conceptual open pit boundary.

- Hole DDH 24-005 intersected 26 metres grading 113 g/t Ag. This intercept is located approximately 35 metres south of the conceptual open pit margin and is expected to extend mineralization and the Mineral Resources in that direction.

John Miniotis, President and CEO, commented, "We are pleased to see this successful start to our Phase IV drilling program which demonstrates the significant upside potential at Diablillos. These initial results demonstrate the strong continuity of high-grade silver mineralization surrounding the JAC deposit, which continues to remain open in multiple directions."

Dave O'Connor, Chief Geologist, commented, "We are excited by the initial drill results received from the Phase IV drill program. In addition to the ongoing step-out drilling near JAC, drilling is also currently underway in the area northeast of the Oculto Mineral Resource and the adjacent Cerro Bayo area. Additional holes in these areas will be sited with the aid of detailed structural mapping to optimize targets."

The latest assay result highlights are summarized in Table 1 below.

Table 1 Summary of Diablillos Drill Results

Intercepts greater than 2,000 gram-metres Ag shown in bold text:

Drill Hole

Area

From

(m)

To

(m)

Type

Interval (m)

Ag

g/t

Au g/t

DDH-24-003

JAC

69.0

102.0

Oxides

33.0

86.5

0.01

DDH-24-004

JAC

54.0

69.0

Oxides

15.0

31.0

0.01

DDH-24-004

105.0

108.0

Oxides

3.0

71.8

0.01

DDH-24-004

110.0

143.4

Oxides

33.4

244.9

0.01

DDH-24-004

Includes

125.0

131.0

Oxides

6.0

603.4

-

DDH-24-005

JAC

93.0

119.0

Oxides

26.0

112.9

0.03

122.0

129.0

Oxides

7.0

143.3

0.03

Note: All results in this news release are rounded. Assays are uncut and undiluted. Widths are drilled widths, not true widths. True widths are estimated to be approximately 80% of the interval widths for oxides.