122.5 m at 1.42% Li2O and 71.4 m at 1.57% Li2O at CV5

In This Article:

VANCOUVER, BC, May 16, 2024 /PRNewswire/ -- May 16, 2024Sydney, Australia

Highlights

  • Continued strong lithium mineralization over wide intervals from infill drilling at CV5.

    • 122.5 m at 1.42% Li2O, including 35.8 m at 2.15% Li2O (CV24-405).

    • 71.4 m at 1.57% Li2O, including 14.2 m at 3.15% Li2O (CV24-435).

    • 68.7 m at 1.56% Li2O and 22.5 m at 1.04% Li2O (CV24-414).

    • 74.9 m at 1.28% Li2O, including 28.1 m at 2.28% Li2O (CV24-423A).

    • 53.0 m at 1.22% Li2O, including 25.0 m at 1.65% Li2O (CV24-450).

  • The focus of the 2024 winter drilling at CV5 was to support an upgrade in mineral resource confidence, from the inferred category to the indicated category, targeting release in Q3 2024 inclusive of a maiden CV13 resource.

  • Multiple holes remain to be reported targeting the newly discovered high-grade zone at CV13, with the Company to report the assay results as soon as they are received in the coming weeks.

  • 38,887 m (111 holes) remain to be reported from the 2024 winter drill program – 27,611 m (67 holes) at CV5, and 11,276 m (44 holes) at CV13.

Patriot Battery Metals Inc. (the "Company" or "Patriot") (TSX: PMET) (ASX: PMT) (OTCQX: PMETF) (FSE: R9GA) is pleased to announce the next batch of core assay results for drill holes completed in 2024 at the CV5 Spodumene Pegmatite. The Corvette Property (the "Property" or "Project"), wholly owned by the Company, is located in the Eeyou Istchee James Bay region of Quebec. The CV5 Spodumene Pegmatite, with a maiden mineral resource estimate ("MRE") of 109.2 Mt at 1.42% Li2O inferred1, is situated approximately 13.5 km south of the regional and all‑weather Trans-Taiga Road and powerline infrastructure.

Darren L. Smith, Vice President of Exploration for the Company comments, "Another round of CV5 core assays from our infill program and it continues to deliver to expectations. Coupled with the new high-grade discovery at CV13, the 2024 winter program's results continue to demonstrate the quality and scale on show at Corvette."

"It's been a huge effort from the team to progress what was a very large-scale drill program over the last 6-8 months. Through their efforts, all drilling up until our recent seasonal break, including the previously highlighted CV13 high-grade discovery, will make it into the upcoming resource update", added Mr. Smith.

Figure 1: Drill holes completed at the CV5 Spodumene Pegmatite through April 2024.
Figure 1: Drill holes completed at the CV5 Spodumene Pegmatite through April 2024.

Core assay results for 20 drill holes, completed during the recently completed 2024 winter drill program at the CV5 Spodumene Pegmatite, are reported herein (Figure 1). Highlights include: