Lomiko Metals Announces Process for Settlement of Debts for Shares

In This Article:

MONTREAL, October 31, 2024--(BUSINESS WIRE)--Lomiko Metals Inc. (TSX.V: LMR) ("Lomiko Metals" or the "Company") The Company announces that it will be making an application to the TSX Venture Exchange to settle a portion of outstanding debts in the amount of $90,000 Cdn. through the issuance of 545,455 common shares at a deemed value of $0.165. The creditors are insiders of the Company. The closing of the shares for debt application and the issuance of the shares is subject to the TSX Venture Exchange approval. All common shares to be issued will be issued with the required four-month plus one day hold period from issuance.

About Lomiko Metals Inc.

The Company holds mineral interests in its La Loutre graphite development in southern Quebec. The La Loutre project site is within the Kitigan Zibi Anishinabeg (KZA) First Nation’s territory. The KZA First Nation is part of the Algonquin Nation, and the KZA traditional territory is situated within the Outaouais and Laurentides regions.​ Located 180 kilometers northwest of Montreal, the property consists of one large, continuous block with 76 mineral claims totaling 4,528 hectares (45.3 km2).

The Property is underlain by rocks from the Grenville Province of the Precambrian Canadian Shield. The Grenville was formed under conditions that were very favorable for the development of coarse-grained, flake-type graphite mineralization from organic-rich material during high-temperature metamorphism.

Lomiko Metals published an updated Mineral Resource Estimate (MRE) in a NI 43-101 Technical Report and Mineral Resource Estimate Update for the La Loutre Project, Quebec, Canada, prepared by InnovExplo on May 11th, 2023, which estimated 64.7 million tonnes of Indicated Mineral Resources averaging 4.59% Cg per tonne for 3.0 million tonnes of graphite, a tonnage increase of 184%. Indicated Mineral Resources increased by 41.5 million tonnes as a result of the 2022 drilling campaign, from 17.5 million tonnes in 2021 MRE with additional Mineral resources reported down-dip and within marble units resulted in the addition of 17.5 million tonnes of Inferred Mineral Resources averaging 3.51% Cg per tonne for 0.65 million tonnes of contained graphite; and the additional 13,107 metres of infill drilling in 79 holes completed in 2022 combined with the refinement of the deposit and structural models contributed to the addition of most of the Inferred Mineral Resources to the Indicated Mineral Resource category, relative to the 2021 Mineral Resource Estimate. The MRE assumes a US$1,098.07 per tonne graphite price and a cut-off grade of 1.50% Cg (graphitic carbon).