Bam Bam Completes Second Hole at the Majuba Hill Property

Vancouver, British Columbia--(Newsfile Corp. - May 25, 2020) - Bam Bam Resources Corp. (CSE: BBR) (OTC: NPEZF) ( FSE: 4NPA) ("Bam Bam" or the "Company") is pleased to report that it has completed the second core hole ("MHB-02") of the 2020 Phase 1 drilling program at its flagship Majuba Hill Property (the "Property"), a copper, gold porphyry project located in Pershing County, Nevada.

The hole was designed to expand the copper, gold, and silver mineralization identified in the historic drill data. Hole MHB-02 was drilled at a -45° inclination on an 045 azimuth to 474.5 feet.



Figure 1

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/6332/56455_figure1.jpg

The core was logged on-site. The core is sawn and sampled by Bam Bam contractors at the secured warehouse facility in Elko, Nevada. Core from the first hole MHB-01 has been submitted to ALS Geochemistry for sample analysis. The submittal includes copper, gold, and silver standard reference material, which meets CIM Mineral Exploration Best Practice Guidelines.

Mr. David Greenway, President & CEO, reports: "The core in the second drill hole, MHB-02, also showed rock-types and alteration that our geologist expected. We are encouraged that we now have two drill holes which have intersected what our geologic model predicted. I am looking forward to getting the analytical results from ALS Geochemistry."



MHB-02 Box 12 - 111.5 to 120.5 Feet

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/6332/56455_figure2.jpg



MHB-02 Box 13 - 120.5 to 130 Feet

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/6332/56455_figure3.jpg

About Majuba Hill Property

The Majuba Hill Property encompasses 4,822 acres of surface and mineral rights that includes 3 patented lode mining claims and 632 acres of privately-owned surface and minerals. The Property is easily accessed via 23 miles of well-maintained dirt roads leading from U.S. Interstate 80.

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. Drill core is delivered by the company consulting geologist to the secure warehouse facility in Elko, Nevada. Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags. The samples are then transported directly to the ALS Sample Prep Facility in Elko, Nevada. ALS will then transport the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. All samples are analyzed for copper, gold, silver, and 31 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are copper-gold-porphyry commercial standard reference material pulps, which are inserted in the analytical sample sequence. The sample rejects and remaining pulps will be retrieved from ALS.